4-Unit Chemical Overhaul at Mont Kiara Condo
Full chemical overhaul for 4 neglected Daikin units. Cooling restored to 100%.
Real aircond projects across Kuala Lumpur — from routine servicing to full chemical overhauls.
Full chemical overhaul for 4 neglected Daikin units. Cooling restored to 100%.
Chemical wash for 6 Daikin ceiling cassette units at a Bukit Jalil fitness centre. Sweat odour elimination and cooling restoration.
Chemical wash for 3 Midea wall-mounted units at a Desa Petaling terrace house. Restored cooling efficiency and eliminated musty odour.
Chemical wash for 2 Daikin ceiling cassette units at a Wangsa Maju office. Eliminated foul smell and restored airflow.
Case study: Safe dismantling of 5 mixed aircond units at a Bukit Jalil office undergoing renovation. Proper refrigerant recovery and unit protection for reinstallation.
Case study: Professional dismantling and storage of 3 Daikin wall-mounted units during a KLCC condo renovation. Safe refrigerant recovery by Masters Aircond Service KL.
Case study: R32 gas leak detection and repair on a Daikin wall-mounted unit at Taman Desa condo. Full pressure test and recharge by Masters Aircond Service KL.
Case study: R410A gas top-up for 2 York wall-mounted units at PV18 Residence, Setapak. Low refrigerant caused poor cooling — restored with proper gas charging.
Case study: Installation of 2 Daikin wall-mounted units at a Bangsar South studio apartment in The Horizon Residences. Compact space installation with concealed trunking.
Case study: Installation of 3 new Daikin inverter wall-mounted units at Eko Cheras condominium. Professional piping, bracket mounting, and commissioning.
Case study: 5-unit Panasonic aircond installation for a newly built double-storey house in Kepong. Complete piping, wiring, and commissioning by Masters Aircond Service KL.
Case study: Quarterly maintenance contract for 4 wall-mounted and 2 ceiling cassette Panasonic units at a Bangsar medical clinic. Consistent cooling and zero downtime achieved.
Case study: Annual maintenance contract for 8 Daikin units at a KLCC commercial office. Quarterly servicing keeps systems running efficiently year-round.
Case study: Full chemical overhaul for 8 Daikin units including ceiling cassettes at a luxury Mont Kiara penthouse. Complete restoration by Masters Aircond Service KL.
Case study: Complete chemical overhaul for 3 Panasonic ceiling cassette units at a busy Sri Petaling restaurant. Grease-clogged coils restored to full capacity.
Case study: Emergency compressor repair for a Midea wall-mounted unit at a Kepong landed house. Faulty capacitor replaced, cooling restored same day.
Case study: Emergency drainage repair for 2 leaking Midea wall-mounted units at a Cheras condo. Water damage prevention by Masters Aircond Service KL.
Case study: PCB board replacement for a Panasonic wall-mounted unit at an Old Klang Road shophouse. Erratic behaviour fixed with new control board.
Case study: Complete aircond servicing for 6 Panasonic wall-mounted units at a Bangsar bungalow near Jalan Maarof. Deep cleaning restored full cooling efficiency.
Case study: Monthly aircond servicing contract for 4 York ceiling cassette units at a Setapak commercial kitchen. Grease and heat management by Masters Aircond Service KL.